Friars Primary School

Architect:
Architecture of Change
Completed:
2006
Publications:
AJ, July 2006
Categories:
Education, Refurbishment, London
Photography:
Dominik Gigler

A very enjoyable extension to an existing 1960s two storey school building using an extensive palate of materials to enhance the children's awareness of their surroundings, constructed within a tight contract period of 10 weeks on site to coincide with term time.  For practical and visual reasons support for the structures were kept to a minimum, with no interfering cross bracing.