Titan House, Bermondsey
- Architect:
- Glenn Howells Architects
- Completed:
- 2010
- Categories:
- Housing, New Build, Basements + Excavation, London
A new build apart-hotel in a very restricted inner city site. The project consists of 120 self-contained apartments with swimming pool/gym at basement level and commercial units at ground floor level. The design involved excavating up to 6.0m deep over the area of the site working up to adjacent buildings on 85% of the perimeter with associated complex foundation and phasing issues.